- Add React landing page with TailwindCSS + Framer Motion for synor.cc - Add Docker deployment configs for explorer-web and website - Create comprehensive zero-cost deployment plan using: - Vercel (free tier) for all frontends - Supabase (free tier) for PostgreSQL - Upstash (free tier) for Redis rate limiting - Oracle Cloud Always Free for blockchain nodes (24GB RAM) - Update Phase 7 documentation with current status Total estimated cost: $0-1/month for production deployment
3.6 KiB
3.6 KiB
Synor Development Plan
Structured milestone documentation for the Synor quantum-secure blockchain
Phase Overview
| Phase | Name | Status | Progress | Milestones |
|---|---|---|---|---|
| 0 | Foundation | ✅ Complete | 100% | 2 |
| 1 | Node Integration | ✅ Complete | 100% | 2 |
| 2 | CLI Wallet | ✅ Complete | 100% | 2 |
| 3 | Network Bootstrap | ✅ Complete | 100% | 2 |
| 4 | Smart Contracts | ✅ Complete | 100% | 2 |
| 5 | Governance | ✅ Complete | 100% | 2 |
| 6 | Quality Assurance | ✅ Complete | 100% | 3 |
| 7 | Production Readiness | 🔄 In Progress | 85% | 3 |
Phase 7 Breakdown
| Milestone | Status | Progress |
|---|---|---|
| Security Audit | ⏳ Pending | Requires external |
| Mainnet Launch | 🔒 Blocked | Awaiting 30-day testnet |
| Ecosystem | 🔄 In Progress | 85% |
Ecosystem Components (Milestone 3)
| Component | Status | Notes |
|---|---|---|
| Web Wallet | 95% | QR, hardware, i18n complete |
| Desktop Wallet | 90% | System tray, auto-updates done |
| Mobile Wallet | 0% | Deferred to post-mainnet |
| Explorer Frontend | 100% | Full React app deployed |
| Documentation | 90% | 4 tutorials + exchange guide |
| API Gateway | 95% | Rate limiting operational |
| Exchange Integration | 80% | Comprehensive docs ready |
Directory Structure
docs/PLAN/
├── README.md (this file)
├── PHASE0-Foundation/
│ ├── 01-Milestone-01-CoreTypes.md
│ └── 01-Milestone-02-Cryptography.md
├── PHASE1-NodeIntegration/
│ ├── 01-Milestone-01-ServiceWiring.md
│ └── 01-Milestone-02-GenesisChain.md
├── PHASE2-CLIWallet/
│ ├── 01-Milestone-01-WalletCrypto.md
│ └── 01-Milestone-02-CLICommands.md
├── PHASE3-NetworkBootstrap/
│ ├── 01-Milestone-01-TestnetDeployment.md
│ └── 01-Milestone-02-NetworkHardening.md
├── PHASE4-SmartContracts/
│ ├── 01-Milestone-01-ContractSDK.md
│ └── 01-Milestone-02-ContractTooling.md
├── PHASE5-Governance/
│ ├── 01-Milestone-01-DAOLaunch.md
│ └── 01-Milestone-02-GovernanceFeatures.md
├── PHASE6-QualityAssurance/
│ ├── 01-Milestone-01-Benchmarks.md
│ ├── 01-Milestone-02-Testing.md
│ └── 01-Milestone-03-Optimization.md
├── PHASE7-ProductionReadiness/
│ ├── 01-Milestone-01-Security.md
│ ├── 01-Milestone-02-MainnetLaunch.md
│ └── 01-Milestone-03-Ecosystem.md
Validation Strategy
Each milestone includes:
- Tasks: Specific implementation requirements
- Files: Source files to create/modify
- Validation Commands: Commands to verify implementation
- Validation Agents: Automated agents for code review
- Security Checks: Security-specific validations
- Compliance: Regulatory compliance requirements
Running Validations
# Run all unit tests
cargo test --workspace
# Run integration tests
cargo test --workspace --test '*'
# Run benchmarks
cargo bench --workspace
# Security audit with cargo-audit
cargo audit
# Code coverage
cargo tarpaulin --workspace --out Html
# Lint with clippy
cargo clippy --workspace -- -D warnings
Agent-Based Validation
| Agent | Purpose | Trigger |
|---|---|---|
code-reviewer |
Code quality and patterns | After milestone completion |
silent-failure-hunter |
Error handling validation | After error-related changes |
pr-test-analyzer |
Test coverage analysis | Before PR merge |
type-design-analyzer |
Type system validation | After type changes |
Last updated: January 7, 2026